Milling also produces a rough grooved surface which will increase the existing pavement surface area when compared to an ungrooved surface The surface area increase is dependent on the type number condition and spacing of cutting drum teeth but is typically in the range of 20 to 30 percent which requires a corresponding increase in tack coat 20 to 30 percent more when compared to an